Production Costs

*No Sales Tax in Oregon*
CITY OF PORTLAND
portlandonline.com

The Mayors office requires a ?Production Application? that registers filming activity within the City of Portland, a Business License and Insurance. Most commercial & print production companies that reside outside the City of Portland are eligible for a ?Business License Exemption?. Please see the ?Sample? form on their web site as to how to fill it out. Besides the standard certificate naming the City of Portland as holder, there is an insurance requirement that is necessary if your plan to hold traffic within the city limits or use a city park. It is an ?Additional Insured Endorsement? and must be signed by the insurance company, which can take a few days to execute. If it is only reserved parking needed, the special endorsement is not needed. If you are entirely on private property, then just the ?Production Application? registration is required. There is NO fee associated with the ?Production Application? registration.
OUTSIDE CITY LIMITS

Some counties and adjacent cities have a ?Film Permit? that is need if you plan to be on public property, but most don?t. Many times road permits are treated like road construction and fall under a ?right of way? permit. If it is a large complicated shoot, it may come under ?Special Uses? such as a Parade permit.

Sample permit costs on county roads are as such:
Multnomah County (Right of Way Permit) $50/Road Permit
Clackamas County (Film Event Permit)$0/Film Permit (deposit required)
*$5000 deposit check is un-cashed, p/u after shoot
Washington County (Film Event Permit)$110/Fee (visa not accepted)

CITY OF PORTLAND / RESERVED PARKING:

Metered Areas: $22.00/space (20 ft)/day
Non-Metered Areas: $66.00/blockface/day
Area Parking Permit Areas: $7.50/space (20 ft)/day

If the metered parking is within the ‘Smart Meter’ zone, then the City does the posting. If it is the older/standard meters, you must pick-up meter bags and place them yourself. On streets where there are no meters, a barricade company must be used and a member of production must place them and staple the meter bags to them. Meter bags are disposable after shoot.

BARRICADE COMPANY:

NO PARKING BARACADES: DELIVERY & PICK-UP:
1 to 4 @ .80 cents each/day $70
5 to 9 @ .80 cents each/day $75
10 to 14 @ .80 cents each/day $85
15 to 20 @ .80 cents each/day $90
21 to 25 @ .80 cents each/day $95
26 to 30 @ .80 cents each/day $100

CONES:
28 / minimum of 4 / .65 cents each/day
18 / minimum of 5 / .45 cents each/day

Barricade companies can drop items, but are unable to place and set up.

TRAFFIC CONTROL:

Most traffic control done within the City of Portland can SAFELY be performed by Certified Flaggers rather than Police. Sometimes if the closure is large and complicated, a mixture of both police and flaggers can be used together. This is a great saving opportunity on a production budget!
SAMPLE FLAGGER RATES:

K & D 1.800.343.4094 x111

$18/HR (4 HR MIN – Between the hours of 6am to 6pm)
OT RATE $27/HR: (Between the hours of 6pm to 6am)
TRUCK W/ EQUIP: $160/DAY
EXTRA CONES: $1/EA
EXTRA SET(S) OF SIGNS: $75/SET
TRAFFIC PLAN: $160/EA (4 HR MIN. + $40/hr after 4 hrs time)
SAMPLE POLICE / SHERIFF RATES:

CITY OF PORTLAND:
Police Officers $59.64/HR (4 hr min.)
Sargent $68.50/HR (1 required per 4 Police Officers)

Multnomah Co Sheriff $50/HR
Clackamas Co Sheriff $73.18/HR
Washington Co Sheriff $79/HR (for the 1st one, and then $69/HR per additional Deputy). They run in 12-hour shifts and must be replaced after 12hrs of duty.

*There is NO overtime rate.

PORTLAND PARKS & RECREATION:

Application Fee: $46.25 or $67.00/ if less than (3) working days of shoot date

Film & Video Fees: Crew Size 1-25 Crew Size 25 and above
Hourly $18.50 (2 hr min.) $37.00 (2 hr min.)
3-14 Hrs $222.50 (maximum) $445.00 (maximum)
15-24 Hrs $344.75 (maximum) $689.50 (maximum)

Still Photography Fees: Crew Size 1-25 Crew Size 25 and above
Hourly $13.25 (2hr min.) $26.25 (2 hr min.)
Up to 24hrs $79.50 (maximum) $159.25 (maximum)

All park permits require the ?Additional Insured Endorsement? from the Mayors office that must be signed by the insurance company.

Additional fees may apply such as:
Vehicle access $48/vehicle

OREGON STATE PARKS:

Film production get special breaks on permit fee(s)?thanks Governor!

Application Fee: $100.00
Permit Fee: $0
OREGON DEPARTMENT OF TRANSPORTATION (ODOT):

The ODOT permit coordinator estimates what the recovery costs are for your specific project and you are required to bring a check in that amount when picking up your permit. Upon completion of filming, either a refund or a bill for the balance owed will be sent to the production company. It usually takes approximately 8 weeks for them to reimburse or send invoice. The inspector usually just stops by to check-in and make sure things are going smoothly. If it is a complicated shoot, they might decide that it is necessary to have the inspector there for a portion of the day. The recovery costs associated with the Permit Preparation is that of the engineer that reviews the traffic plan that you have submitted with the permit request.

Application Fee: $0
ODOT inspector $50/HR
Permit Preparation $50/HR

BRIDGE PERMITS:

MULTNOMAH COUNTY:
The Broadway, Morrison, Hawthorne, Burnside and Sellwood Bridges
Permit Fee: $50/day
Hours Available: From 3am Saturday(s) to 12noon Sunday(s)
Anything beyond that must go before the Board of Commissioners, which requires a 30-day advance.

ODOT:
Ross Island, St. Johns & *Steel Bridge(s)

*Steel Bridge: ODOT/PDOT/TRIMET/UNION PACIFIC RAIL ROAD all have portions of the Steel Bridge. It can be complicated to permit and a clear understanding of who has jurisdiction over which part can be tricky!

NATIONAL SCENIC AREA(S):

Still Photography:
1-3 persons $63.98/day
4-15 persons $191.95/day
16+ persons $319.92/day

Motion Picture and Uses. Television Production:
1-10 person $191.95/day
11-30 persons $255.94/day
31-60 persons $640.87/day
60+ persons $768.84/day

U.S. FOREST SERVICE:

Minimum Use Fee $80

Still Photography:
1-3 people $95.00/day
4-15 people $199.44/day
16 or more $332.40/day
31-60 people $665.86/day

Motion Picture & TV production:
1-3 people $95.00/day
4-10 people $199.44/day
11-30 people $265.92/day
60 or more $798.82/day

FIRE HYDRANT PERMIT:

Two checks must be delivered to the Water Department, one for the equipment rental and one fully refundable deposit check.

First Check: $172.00
Minimum of (3) day Hydrant Meter rental: $172.00 and a charge of $27/per day thereafter if not returned after 3 days. This rental includes the first 700 cubic feet of water used. After that, water is charged at $1.77 / 100 cubic feet used.

Second Check: $900.00
This check is fully refunded AFTER the final bill is sent out to you AND you have paid it?this takes up to 60 days.

WATER TRUCK:

$90/HR with an 8-hour minimum (port-to-port). Company located 12 miles South of Downtown Portland.

TRIMET: CITY BUSES

Bus + Driver $87.34/HR

Un-Available Times:
M-F / Peak Hours 6am to 9am & 5pm to 7pm
Weekends Available all hours

*Trimet is a non-profit and only seeks cost recovery for filming use.
TRIMET RAIL SYSTEMS: MAX / STREETCAR

Charter Rates

(1) Train Car / $322.00 / First 2 Hours, $105/HR there after
(2) Train Cars / $503.00 / First 2 Hours, $175/HR there after

Rates incude operator. Non-refundable $200.00 Deposit and (2) week notice required. If you want to get on an ?in-operation? train car and go with the public, that is possible and the charge is $0. In such case you must get permission from the public if they enter your frame and in some cases the ?You Are Being Filmed? signage may work fine. In all cases you must get a permit and provide proper insurance.